Belanja Material tanggal 20 Oktober 2012 di Lugina | |||||
No. | Jenis Material | Jumlah | Satuan | Harga | Total |
1 | Semen 3 roda | 10 | sak | 62,000 | 620,000 |
2 | Keni 3" | 3 | pc | 6,000 | 18,000 |
3 | Tee 3" | 4 | pc | 9,000 | 36,000 |
4 | Pipa wavin D3" | 1 | btg | 55,000 | 55,000 |
5 | Lem paralon isarplas | 2 | pc | 5,000 | 10,000 |
6 | Pipa wavin D1/2" | 1 | btg | 12,500 | 12,500 |
7 | Kuas 4" | 1 | pc | 13,000 | 13,000 |
8 | Pintu WC | 2 | pc | 160,000 | 320,000 |
9 | Kloset Toho | 2 | pc | 90,000 | 180,000 |
10 | Benang | 2 | pc | 3,000 | 6,000 |
Jumlah | 1,270,500 |
0 komentar:
Posting Komentar
Silahkan isi komentar anda