| Belanja Material tanggal 17 September 2012 di Lugina | |||||
| No. | Jenis Material | Jumlah | Satuan | Harga | Total |
| 1 | Cat Putih Mitrolet | 1 | Pail | 390,000 | 390,000 |
| 2 | Bak Cat | 1 | Pc | 5,000 | 5,000 |
| 3 | Rol 2 inci | 1 | Pc | 20,000 | 20,000 |
| 4 | Pipa Listrik | 2 | Btg | 5,000 | 10,000 |
| 5 | Kabel Eterna 2 x 1.5 | 10 | Meter | 5,500 | 55,000 |
| 6 | Lem Fox | 2 | Bks | 6,000 | 12,000 |
| Jumlah | 492,000 | ||||



















0 komentar:
Posting Komentar
Silahkan isi komentar anda